Recently, the first train made by CRRC for Rail Transit Ziyang Line arrived at Linkong depot and was successfully delivered to the client. Rail Transit Ziyang Line is an urban high-speed line connecting Chengdu Tianfu New District, Eastern New District and Ziyang City. Upon operation start, it will further improve the transportation capacity of Chengdu City and Ziyang City. The remaining trains for the project will be delivered later.
The train for the Ziyang Line consists of 4A cars, with a maximum operating speed of 160km/h. It has the characteristics of fast start and fast stop, high speed and low noise, and will provide better traveling experience for residents along the line.
The overall design of the train body showcases the rich cultural heritage of the two cities. The train adopts multiple measures to reduce the noise within the train. Equipped with ventilation fans adjustable according to the number of passengers, the dual-converter compressor technology, the “top mesoporous plate + hidden side top” air supply structure, and the electric braking to zero technology, the carriage environment is improved, and the comfort level when the train stops and the alignment accuracy are also increased. Multiple intelligent equipment and an information security protection system are used to ensure that the train is safer, more intelligent and faster.